Rexroth Double Gear Pump for Concrete Pump Truck Machine

Rexroth Double Gear Pump for Concrete Pump Truck Machine

Our Advantage
1. There are tons of accessible sequence charge pump in inventory.
two. We are skilled supplier of hydraulics.
3. Our manufacturing facility has a lot more than 10 years exprience in hydraulic business.
four. Our manufacturing facility is shut to ZheJiang port & HangZhou port.

Real shooting:

Bundle:

Delivery:

Packing specifics:

CZPT Brand, CZPT or Customer’s needs packing 

CZPT carton or very same as the Customer’s demands, export CZPT carton

All cartons ought to be packed into the pallets much more very carefully.

All of the productions are inspected meticulously a single by a single by QC just before supply.

Shipping and delivery time:

We have large amount of stock for full pumps, motor and some spare areas, 
so the major time is within 3days if have in inventory. 
If haven’t, in 5days if the quantity is considerably less than 50pcs. 
It relies upon on the amount ordered.

Min. Get:
If the design is typical or the production in our stock warehouse, there is No MOQ for stocking production.
Larger amount, cost will be much more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It is doorway to doorway or barn to the doorway,
typically five-seven times to get there.

By air to air port, usually three-5 days to arrive

By sea to sea port, generally twenty-thirty days to arrive.

If your deliever time is very urgent, we advise that you pick by courier or air.

If not, it truly is very low cost to by sea.

Contact us:
 
 
 

Rexroth Double Gear Pump for Concrete Pump Truck Machine